How To: Locking a Route (21-20)

Overview

If you need to shut down a route for a short period of time (e.g. driver is ill), you can lock it with this selection. No deliveries/service can be scheduled for the route on the day(s) that it is locked. This allows you to restrict a route without making permanent changes in Route Master Maint (21-90-21).

NOTE: If you need to shut down a route for an extended period of time (driver vacation, bay being remodeled, major vehicle repairs, etc.), we recommend setting the route to ‘Inactive’ in Route Master Maint.

Video

Tip: Use the controls on the video player to watch in Full Screen mode, adjust the quality, or watch on YouTube.

Step-by-Step

Click image to enlarge.

  1. Specify a schedule date using the green arrow buttons, the calendar button, or by entering the date in the field at the top of the screen. Today’s date appears by default.

  1. Route information appears for the specified date. Select a route by clicking on it.

Click image to enlarge.

  1. The options window opens. Click the Change Status to Locked button.

Click image to enlarge.

  1. ‘Locked’ appears to the right of the ‘Schedule Stops’ column, signifying that this route has been locked. No deliveries/service can be scheduled for this route on this date.
    • To unlock the route, click on it and then click the Change Status to Available button on the options window.