How To: Viewing All Dates for a Route (21-20)

Overview

In addition to viewing schedules for all routes for a single day, you can also view all created schedule dates for a specific route with this selection.

Video

Tip: Use the controls on the video player to watch in Full Screen mode, adjust the quality, or watch on YouTube.

Step-by-Step

Click image to enlarge.

  1. Specify a schedule date using the green arrow buttons, the calendar button, or by entering the date in the field at the top of the screen. Today’s date appears by default.

  1. Select a route by clicking on it.

Click image to enlarge.

  1. The options window opens. Click the View all dates [for] this Route button.

Click image to enlarge.

  1. Created schedules for the route appear.
    • The number of schedules dates that appear on this screen is determined by the ‘Create schedule headers # days into the future’ preference. Remember that schedules are created when Start of Day is run.
    • You can change the route by using the drop-down menu at the top of the screen.
    • This screen will display dates starting with the date selected on the first screen of this selection. To view prior dates, click the Restore Date button.

  1. Click on a date to modify it. A new window opens, providing you with the option to lock the route for the date, view all routes for that day (the default view that appears when accessing the selection), and change stops for the date. Please view the appropriate tutorial in this section of the documentation for detailed instructions on each of these processes.