How To: Sale Pending Method 1A – Reviewing the G/L Postings and Sales Analysis Reports

Overview

This tutorial describes how to run the G/L Postings and Sales Analysis Reports as part of the review process for Sale Pending Method 1A.

Step-by-Step

Click image to enlarge.

  1. Run Selection 10 on the General Ledger menu. This report should include all postings from the closed sales day and the cost of parts from Work Order Audit/Update (07-05).
    • If there are no parts costs on the report, it’s because the ‘Post to G/L now’ prompt was answered “N” during Work Order Update. The information is still in the file and will be updated the next time Work Order Update is run (and “Y” is entered at the prompt).
    • If the ‘Post Non-Inventory Product Type Costs’ box is checked in Ticket G/L Interface (02-18-13), an additional posting will be included for Non-Inventory Product Types from the cost of labor, as shown above on IN%.

Click image to enlarge.

  1. Run the Sales Analysis Monthly COGS & MISC report (05-05). Find the Installation product type (IN%) for the branch where the Sale Pending transaction was processed. The amount in the ‘COGS VP’ column for this product type should include both labor and parts costs.